Skip to content

Antagonist re-score handoff — F1 project board (2026-08-02)

Audience: Antagonist / human bake-off scorer Prior human score: fleet ~5.8 (REEVALUATION_FULL_2026-08-01.md) Investigation: DazzleAntagonist/INVESTIGATION_2026-08-02.md (still freeze + dual-open audit) Stance: Stills under examples/*/.dazzle/qa/screenshots are truth. Dual-open volume is not score proof.


Ask

Please re-check project_tracker board delta chrome after recapture:

Still Path Expect
Project board (manager) examples/project_tracker/.dazzle/qa/screenshots/project_board_manager_desktop_light.png Absolute delta + vs prior 30 days; no (150.0%) / triple-digit % theater; spaced tokens

Optional hold-check (not re-scored this pass unless you choose):

| support ticket_queue | Avatar SA/MA hold | | fieldtest issue_triage | FT-* device codes hold |


Agent self-check

Check Result
Code: omit |delta_pct| ≥ 100 PASS (existing aggregation + emit belt)
Recapture project_tracker PASS 2026-08-02
OCR: no 150%/200% theater PASS
OCR: spaced vs prior PASS
OCR residual delta_theater Wired into product_quality presentation residual

Messaging

Safe Forbidden
“F1 project board recaptured; delta theater gone on still” Category competitive
“Investigation 02 Aug: dual-open not still-proven; only F1 recapture this handoff” Fleet lift from dual-open
“residual_total=0 + presentation residual ok” Closing #1626

Explicit non-goals this handoff

  • F3–F7 product polish
  • Full fleet recapture
  • Category depth (F6)