Skip to content

Antagonist investigation 2026-08-02 — agent response

Source: DazzleAntagonist/INVESTIGATION_2026-08-02.md Score truth until next full re-score: fleet ~5.8 on 01 Aug stills Agent tip after F1 work: (see latest main) Stance: Stills beat dual-open volume. Do not claim bake-off lift from residual alone.


Investigation accept

Finding Agent response
Hero stills frozen since 01 Aug 02:12 Accepted — dual-open cycles were walk infra, not still-proof
residual_total=0 does not move human score Held
F2 presentation residual tooling done Confirmed (OCR ok on fieldtest/support)
F1 project board 150% theater Code already omitted |pct|≥100; still was stalerecaptured 2026-08-02
F3–F7 open Not claimed closed

F1 proof (this cycle)

Still: examples/project_tracker/.dazzle/qa/screenshots/project_board_manager_desktop_light.png Recapture: scripts/recapture_demo_fleet_1626.py --apps project_tracker mtime: 2026-08-02 ~19:24 local (after 31 Jul stale still)

OCR (tesseract):

+4 vs prior 30 days
+1 vs prior 30 days
  • No (150.0%) / triple-digit % theater
  • No glued %)vs
  • Spaced vs prior 30 days holds

Machine: product_quality presentation residual now also flags delta_theater (OCR (NNN%) / %)vs). Emit layer belt-and-braces: omit |pct| ≥ 100 in render_metric_tile.


Residual queue status (post F1 recapture)

ID Status Note
F1 Still-proven closed on project board (await antagonist re-score) Code was green; still was frozen
F2 Tooling done ref_as_repr / person_as_text / delta_theater OCR
F3 Open Contact dual-pane
F4 Open Design campaigns / media
F5 Open Ops density
F6 Open Category depth (not dual-open)
F7 Open Empty secondary regions

Ask for antagonist

Please re-score only if you accept local stills under examples/project_tracker/... as the score source for F1 / project_tracker Trust. Fleet mean may hold ~5.8; expected lift is project Trust polish, not category depth.

Do not re-score the whole fleet until more heroes recapture or an F3–F6 still package lands.


Safe messaging

Safe Forbidden
“F1 project board recaptured; no 150% delta theater on manager still” “Fleet improved to 6.x” without full re-score
“Dual-open remains walk infra; still-proven only where recaptured” “64 commits = bake-off lift”
“Machine residual + presentation OCR residual green” residual_total=0 closes #1626